Track Record 2008

ARTHIT Pipeline End Manifold Tie-In Spool Modification and Installation

 

Date Awarded:
 
2008 arthit pipe
Client:
 
PTT Exploration and Production Public Company Limited
Description:
 
ARV Offshore was contracted to perform the necessary on-site measurements, engineering, metrology, and analysis of the recovered Z Spool, modify the Z Spool to fit properly, transport the modified spool back to the site and deploy it to the seabed.
 
ARV Offshore then installed the Z Spool installation to connect the Arthit PLEM to the JDA A18 pipeline and de-water the spool. Finally operating 24 x 42” valves to allow equalization of gas pressure on both sides of the leaking pipeline end manifold valve.
 
Destination:
 
Gulf of Thailand

 

 


 

 

 

 


 

 