Northern Arthit Development in the Gulf of Thailand

 

Date Awarded:
 
2008 ARTHIT Development
Client:
 
PTT Exploration and Production Public Company Limited
Description:
 
ARV Offshore fabricated the inlet and export pipeline end manifold, including the procurement of certain parts, fabricated 16 inch and 18 inch (outside diameter) tie-in spools and Arthit pipeline end manifold tie-in spool (APTIS) with a 12 inch (outside diameter) tie-in spool, cut the existing 16 inch pipeline and installed two mechanical connecters, installed the 16 inch inlet pipeline end manifold, installed the export pipeline end manifold and tie-in into an 18 inch gas export pipeline, installed the APTIS into the existing PTT Arthit pipeline end manifold and tie-in to the 18 inch gas export pipeline, hydro tested and pre-commissioned the gas export pipeline and commissioned it by introducing gas form the Arthit pipeline end manifold.
 
Destination:
 
Gulf of Thailand


 

 

ISO 9001; ISO 14001; OHSAS 18000

© ARV Offshore